{"id":62148,"date":"2024-04-23T17:52:00","date_gmt":"2024-04-23T14:52:00","guid":{"rendered":"https:\/\/www.tlt.ee\/procurement\/design-and-reconstruction-of-the-heating-systems-of-the-repair-shop-building-at-73-peterburi-road\/"},"modified":"2024-05-03T16:40:41","modified_gmt":"2024-05-03T13:40:41","slug":"design-and-reconstruction-of-the-heating-systems-of-the-repair-shop-building-at-73-peterburi-road","status":"publish","type":"page","link":"https:\/\/tlt.ee\/en\/about-us\/procurement\/design-and-reconstruction-of-the-heating-systems-of-the-repair-shop-building-at-73-peterburi-road\/","title":{"rendered":"Design and reconstruction of the heating systems of the repair shop building at 73 Peterburi road"},"content":{"rendered":"\n<p><a href=\"https:\/\/www.tlt.ee\/wp-content\/uploads\/2024\/05\/Pakkumuse-esitamise-ettepanek-ja-Lisa-1-tehniline-kirjeldus-ver4.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Proposal for Submission and Annex 1<\/a><br><a href=\"https:\/\/www.tlt.ee\/wp-content\/uploads\/2024\/04\/Lisa-2-toovotuleping-Peterburi-tee-kute.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Annex 2 &#8211; Contract for Work<\/a><br><a href=\"https:\/\/www.tlt.ee\/wp-content\/uploads\/2024\/04\/Lisa-3-Pakkumuse-maksumuse-vorm-ver2.xlsx\" target=\"_blank\" rel=\"noreferrer noopener\">Annex 3 &#8211; Cost Form<\/a><br><a href=\"https:\/\/www.tlt.ee\/wp-content\/uploads\/2024\/04\/Lisa-4-Peterburi-tee-73-remonditookojahoone.dwg_.zip\" target=\"_blank\" rel=\"noreferrer noopener\">Annex 4 (.zip)<\/a><br><a href=\"https:\/\/www.tlt.ee\/wp-content\/uploads\/2024\/04\/Lisa-5-Tootervishoiu-ja-ohutuse-ning-turva.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Annex 5 &#8211; Occupational Health and Safety Requirements at TLT Construction Sites<\/a> <br><a href=\"https:\/\/www.tlt.ee\/wp-content\/uploads\/2024\/05\/Peterburi-tee-73-tookoja-kutte-tarbimine-23-24-kutteperioodil.xlsx\" target=\"_blank\" rel=\"noreferrer noopener\">Annex 6 &#8211; Workshop heating consumption during the &#8217;23 &#8211; &#8217;24 heating period<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Proposal for Submission and Annex 1Annex 2 &#8211; Contract for WorkAnnex 3 &#8211; Cost FormAnnex 4 (.zip)Annex 5 &#8211; Occupational Health and Safety Requirements at TLT Construction Sites Annex 6 &#8211; Workshop heating consumption during the &#8217;23 &#8211; &#8217;24 heating period<\/p>\n","protected":false},"author":8,"featured_media":0,"parent":3033,"menu_order":-1,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"class_list":["post-62148","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/tlt.ee\/en\/wp-json\/wp\/v2\/pages\/62148","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tlt.ee\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/tlt.ee\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/tlt.ee\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/tlt.ee\/en\/wp-json\/wp\/v2\/comments?post=62148"}],"version-history":[{"count":7,"href":"https:\/\/tlt.ee\/en\/wp-json\/wp\/v2\/pages\/62148\/revisions"}],"predecessor-version":[{"id":63033,"href":"https:\/\/tlt.ee\/en\/wp-json\/wp\/v2\/pages\/62148\/revisions\/63033"}],"up":[{"embeddable":true,"href":"https:\/\/tlt.ee\/en\/wp-json\/wp\/v2\/pages\/3033"}],"wp:attachment":[{"href":"https:\/\/tlt.ee\/en\/wp-json\/wp\/v2\/media?parent=62148"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}